Cessnock Correctional Facility 330 Bed Expansion
Cessnock Correctional Facility 330 Bed Expansion

Enviro Building Services provisioned the BMS deployment for the Cessnock Jail 330 Bed Expansion.

Problem Overview

The Cessnock Correction Facility Expansion had the following challenges and requirements:

  • This development was a ground build, requiring BMS work for the new building as well as extension of existing buildings with existing BMS
  • As this building is a correctional facility, the BMS needed to be highly secure and reliable
  • Point count of over 750 low level points, and over 100 high level points
  • 2 new admin buildings
  • Monitoring and control of Mitsubishi VRF system
IoT integration
r0_255_4896_3009_w1200_h678_fmax
Solution

Enviro Building Services provided the following solution:

  • Easy IO DDC controllers were deployed and integrated into a Niagara platform
  • This facilitated control and monitoring of HVAC, mains failure and power consumption, generators, security interface, uninterrupted power supply (UPS) and water metering
  • SMS alerts generated for faults, which are provided to facility management
outcome

Enviro Building Services (EBS) has been awarded the upgrade of the existing control system at Cessnock Correctional Facility due to success of the current project. This demonstrates the confidence the facility has in EBS as well as the competence and skill set of  EBS.

Contact us for a consultation or quote