4 and 14 Martin Place BMS Replacements
Project Overview
Enviro Building Services
upgraded the BMS and
HVAC controls at 4 and 14
Martin Place using Nube iO
central plant controllers,
Johnson VAVs, and a Tridium
Niagara visualization
platform, minimizing
tenant disruption.
Project Brief
The aim was to modernize
DDC controls and pneumatic
systems with a new BMS
featuring multi-site web
hosting, NABERS reporting,
and tenancy after-hours
booking, using Niagara N4
software. All work was
conducted after hours.
Outcome
- Hardware Installation:
Implemented Nube iO controllers and Rubix Compute Edge Gateways within the existing BACnet IP network.
- Enhanced Control:
Enabled comprehensive control
of mechanical systems, plus
added functionalities like
electrical meters, LoRa water/gas
metering, and CO2 monitoring.
- Johnson Controls Integration:
Updated to Johnson Controls VAV
and DDC BACnet devices using
the BACnet RS485 network.
- Niagara Hosting:
Hosted the Niagara platform on
Nube iO EDGE X1 hardware, boosting CPU and processing power.
- Advanced Features:
Mapped cloud connectors to tenancy booking systems, tagged for future web-based booking and analytics.
Disney Studios BMS Replacements
Project Overview
Enviro Building Services
upgraded the BMS and HVAC
controls for Disney Studios
in Moore Park, replacing
outdated equipment with
Nube iO BMS controllers
and a Tridium Niagara
visualization platform.
Project Brief
The objective was to
replace outdated BMS
field controllers in seven
buildings and install a
Tridium Niagara platform for
seamless integration with
a locally hosted Niagara
system. The new controllers
needed dual Ethernet ports
for enhanced connectivity.
Outcome
- Hardware Installation:
Replaced old BMS hardware with
Nube iO Rubix Computes and Rubix
IO16 controllers, installing a new BACnet IP network in each building.
- Core Management:
Each building received a Niagara Edge X1 Rubix Compute Edge Gateway to manage the new controllers and mechanical systems.
- Future-Proofing:
Designed the network to support
future additions like tenant electrical meters, LoRa water and gas
metering, and CO2 monitoring.
- Enhanced Performance:
Improved CPU and processing power for the Niagara stations, ensuring high performance.
- Centralized Control:
Integrated all buildings into a unified Niagara user interface for simplified management and monitoring.
This project modernized Disney Studios’ BMS system, enhancing efficiency and scalability for future needs, aligning with their commitment to
technological excellence and sustainability.
Disney Studios BMS Replacements
Project Overview
Enviro Building Services
upgraded the BMS and HVAC
controls for Disney Studios
in Moore Park, replacing
outdated equipment with
Nube iO BMS controllers
and a Tridium Niagara
visualization platform.
Project Brief
The objective was to
replace outdated BMS
field controllers in seven
buildings and install a
Tridium Niagara platform for
seamless integration with
a locally hosted Niagara
system. The new controllers
needed dual Ethernet ports
for enhanced connectivity.
Outcome
- Hardware Installation:
Replaced old BMS hardware with
Nube iO Rubix Computes and Rubix
IO16 controllers, installing a new BACnet IP network in each building.
- Core Management:
Each building received a Niagara Edge X1 Rubix Compute Edge Gateway to manage the new controllers and mechanical systems.
- Future-Proofing:
Designed the network to support
future additions like tenant electrical meters, LoRa water and gas
metering, and CO2 monitoring.
- Enhanced Performance:
Improved CPU and processing power for the Niagara stations, ensuring high performance.
- Centralized Control:
Integrated all buildings into a unified Niagara user interface for simplified management and monitoring.
This project modernized Disney Studios’ BMS system, enhancing efficiency and scalability for future needs, aligning with their commitment to
technological excellence and sustainability.
Macquarie University 1 Central Courtyard Precinct
Project Overview
Enviro Building Services
delivered a comprehensive BMS
for Macquarie University’s largest construction project, covering 16
and 18 Wally’s Walk, R1 & R2
Student Housing, and the Central
Cooling Precinct Plant, adhering
to 4-star NABERS guidelines.
Project Brief
The project involved engineering,
supplying, installing, and
commissioning a Honeywellbranded Tridium Niagara BMS
across five buildings and a
central cooling district within
24 months. The BMS needed
to integrate FIPs, elevators,
solar, generator, UPS, hydraulic
systems, outside air louvers, and
blinds via various protocols.
Outcome
Enviro Building Services
delivered the BMS on time
and under budget. Key
achievements include:
Integrated a
comprehensive HVAC
system with chilled
beams, FCUs, VAVs,
AHUs, heat exchangers,
and water circuits.
Seamlessly incorporated
the central district
chiller and boiler plant.
Implemented extensive
utility monitoring for
thermal, electrical,
water, and gas usage.
Introduced an afterhours booking system for operational flexibility
The result was an efficient, state-of-the-art BMS that exceeded Macquarie University’s expectations, ensuring sustainable and effective building management.
Macquarie University 1 Central Courtyard Precinct
Project Overview
Enviro Building Services
delivered a comprehensive BMS
for Macquarie University’s largest construction project, covering 16
and 18 Wally’s Walk, R1 & R2
Student Housing, and the Central
Cooling Precinct Plant, adhering
to 4-star NABERS guidelines.
Project Brief
The project involved engineering,
supplying, installing, and
commissioning a Honeywellbranded Tridium Niagara BMS
across five buildings and a
central cooling district within
24 months. The BMS needed
to integrate FIPs, elevators,
solar, generator, UPS, hydraulic
systems, outside air louvers, and
blinds via various protocols.
Outcome
Enviro Building Services
delivered the BMS on time
and under budget. Key
achievements include:
Integrated a
comprehensive HVAC
system with chilled
beams, FCUs, VAVs,
AHUs, heat exchangers,
and water circuits.
Seamlessly incorporated
the central district
chiller and boiler plant.
Implemented extensive
utility monitoring for
thermal, electrical, water, and gas usage.
Introduced an afterhours booking system for operational flexibility.
The result was an efficient, state-of-the-art BMS that exceeded Macquarie University’s expectations, ensuring sustainable and effective building management.
Properties NSW Corporate Multisite BMS Integration
Project Overview
Enviro Building Services integrated a global BMS schedule and seasonal temperature offset across 27 BACnet BMS platforms for Properties NSW, covering HVAC, utility, and environmental reporting for all sites.
Project Brief
The task was to unify 27 buildings, each
with its own BMS, into one system.
Enviro Building Services deployed Nube
iO Edge gateways at each site, mapping
all BMS points to a central cloud server,
creating a global cloud-based dashboard
for overriding HVAC schedules and
seasonal temperature adjustments,
as well as reporting HVAC electrical
metering and environmental data.
Outcome
Enviro Building
Services installed Nube
iO Edge gateways, 4G
routers, and HVAC electrical
meters at all 27 sites. Existing
BMS data points were mapped to
the Nube iO cloud platform, with
wireless LoRa environmental sensors
integrated as BACnet data points.
The resulting dashboard enabled
global setpoint and scheduling
controls, and comprehensive HVAC,
utility, and environmental reporting.
This allowed remote diagnosis
and resolution of HVAC
performance issues, ensuring
optimal occupant comfort across
the Properties NSW portfolio.
The result was an efficient, state-of-the-art BMS that exceeded
Macquarie University’s expectations, ensuring sustainable and
effective building management
Properties NSW Corporate Multisite BMS Integration
Project Overview
Enviro Building Services integrated a global BMS schedule and seasonal temperature offset across 27 BACnet BMS platforms for Properties NSW, covering HVAC, utility, and environmental reporting for all sites
Project Brief
The task was to unify 27 buildings, each
with its own BMS, into one system.
Enviro Building Services deployed Nube
iO Edge gateways at each site, mapping
all BMS points to a central cloud server,
creating a global cloud-based dashboard
for overriding HVAC schedules and
seasonal temperature adjustments,
as well as reporting HVAC electrical
metering and environmental data.
Outcome
Enviro Building
Services installed Nube
iO Edge gateways, 4G
routers, and HVAC electrical
meters at all 27 sites. Existing
BMS data points were mapped to
the Nube iO cloud platform, with
wireless LoRa environmental sensors
integrated as BACnet data points.
The resulting dashboard enabled
global setpoint and scheduling
controls, and comprehensive HVAC,
utility, and environmental reporting.
This allowed remote diagnosis
and resolution of HVAC
performance issues, ensuring
optimal occupant comfort across
the Properties NSW portfolio.
The result was an efficient, state-of-the-art BMS that exceeded Macquarie University’s expectations, ensuring sustainable and effective building management.
21 Harris St 6 Star NABERS & 5 GREEN STAR Efficiency Upgrade
Project Overview
Enviro Building Services
upgraded 21 Harris St to
achieve 6-star NABERS
and 5-star GREEN STAR
accreditations by improving
the existing Johnson
BMS and implementing
new HVAC strategies.
Project Brief
Objectives included
rectifying installation,
engineering, and networking
faults in the Johnson BMS to
enhance HVAC performance,
reprogramming the BMS
hardware, and ensuring
accurate data reporting
for NABERS and GREEN
STAR accreditation.
Outcome
- Hardware Installation:
Added Tridium Niagara devices and
segregated the Johnson Controls
BMS network to reduce traffic.
- Data Reporting:
Mapped and time-stamped data from
electrical, water, thermal, and gas meters for accurate EMS, NABERS, and GREEN STAR reporting.
- Efficiency Strategies:
- Implemented supply air temperature reset strategies for over 50 FCUs.
- Upgraded FCUs to network-based devices.
- Introduced demand control ventilation based on CO2 levels.
- Optimized chiller plant operations and heat rejection strategies.
- Employed pasteurization mode for domestic hot water safety.
- Introduced an after-hours booking system.
333 Kent St NABERS and GREEN STAR Accreditation
Project Overview
Enviro Building Services
delivered a Tridium Niagara
BMS for a new 14-storey
office building in Sydney CBD,
targeting 5 Star NABERS and
5 Star GREEN STAR ratings.
Project Brief
The project involved
engineering, supplying,
installing, and commissioning
a BMS to meet high
standards for 5 Star
NABERS and GREEN STAR
accreditation. The system
needed to monitor various
meters and integrate
FIP, elevators, solar,
generators, UPS, hydraulic,
and security systems.
Outcome
- Hardware Installation:
Deployed Niagara Edge X1
Rubix Compute Edge Gateways
to manage Nube iO Rubix IO16
controllers for HVAC control.
- Enhanced Monitoring:
Enabled monitoring of base
build and sub-tenancy
meters, with after-hours
scheduling for NABERS and
GREEN STAR reporting
- System Integration:
Integrated fire protection,
elevators, solar, generators,
UPS, hydraulic, and security
systems into the BMS.
- Timely Delivery:
Completed on time and
under budget, meeting all
requirements and achieving
high client satisfaction.
Enviro Building Services showcased its expertise in delivering advanced, integrated BMS solutions that ensure high performance, sustainability, and compliance with environmental standards.
333 Kent St NABERS and GREEN STAR Accreditation
Project Overview
Enviro Building Services
delivered a Tridium Niagara
BMS for a new 14-storey
office building in Sydney CBD,
targeting 5 Star NABERS and
5 Star GREEN STAR ratings.
Project Brief
The project involved
engineering, supplying,
installing, and commissioning
a BMS to meet high
standards for 5 Star
NABERS and GREEN STAR
accreditation. The system
needed to monitor various
meters and integrate
FIP, elevators, solar,
generators, UPS, hydraulic,
and security systems.
Outcome
- Hardware Installation:
Deployed Niagara Edge X1
Rubix Compute Edge Gateways
to manage Nube iO Rubix IO16
controllers for HVAC control.
- Data Reporting:
Enabled monitoring of base
build and sub-tenancy
meters, with after-hours
scheduling for NABERS and
GREEN STAR reporting.
- System Integration:
Integrated fire protection,
elevators, solar, generators,
UPS, hydraulic, and security
systems into the BMS.
- Timely Delivery:
Completed on time and
under budget, meeting all
requirements and achieving
high client satisfaction.
Enviro Building Services showcased its expertise in delivering advanced, integrated BMS solutions that ensure high performance, sustainability, and compliance with environmental standards.